ITAC Assessment: CL1915
ITAC logo
ITAC Assessment: CL1915
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Clean Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 25,000
ft2
Annual Production 1,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,005 9,712,800
kWh
Electricity Demand $216,118 17,664
kW-mo/yr
Electricity Fees $1,020 -
Natural Gas $22,681 1,983
MMBtu
Waste Disposal Costs
Water Usage $6,017 152
Tgal
TOTAL YEARLY COSTS $704,841
RECOMMENDED SAVINGS* $106,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $47,547 $200,000 $35,111
742,304
kWh
$12,436
-
kW-mo/yr
02 2.5122: Replace high resistance ducts, pipes, and fittings $15,899 $5,500 $11,741
248,229
kWh
$4,158
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $40,751 $41,281 $23,827
506,946
kWh
$16,924
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,899 - $1,400
29,784
kWh
$499
-
kW-mo/yr
TOTAL RECOMMENDED $106,096 $246,781 $72,079
1,527,263
kWh
$34,017
-
kW-mo/yr
TOTAL IMPLEMENTED $58,549 $46,781 $36,968
784,959
kWh
$21,581
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs