Assessment Year | 1997 |
---|---|
Principal Product | High Pressure Aluminum Cylindres For Medical And Other Indus |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
182,400
ft2
|
Annual Production | 1,068,000
pieces
|
Production Hrs. Annual | 6,375
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $611,253 | 9,053,634 |
kWh
|
$0.068 |
Electricity Demand | $225,297 | 24,352 |
kW-mo/yr
|
$9.25 |
Natural Gas | $85,090 | 56,420 |
MMBtu
|
$1.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,263,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $372,875 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $16,580 | $53,210 |
$12,452
183,177
kWh
|
$4,128
-
kW-mo/yr
|
- | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $242,027 | $70,000 |
$193,881
2,851,993
kWh
|
$29,970
-
kW-mo/yr
|
- | - | $18,176 | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $198,103 | $70,000 |
$158,695
2,334,408
kWh
|
$24,531
-
kW-mo/yr
|
- | - | $14,877 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $155,879 | $298,500 |
$125,552
1,847,011
kWh
|
$30,327
-
kW-mo/yr
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $4,408 | $6,200 |
$3,131
46,014
kWh
|
$1,277
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,971 | $2,200 |
$2,336
34,291
kWh
|
$635
-
kW-mo/yr
|
- | - | - | |
07 | 2.2442: Preheat combustion air with waste heat | $2,597 | $3,500 | - | - |
$2,597
-
MMBtu
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,744 | $150 |
$2,200
32,239
kWh
|
$544
-
kW-mo/yr
|
- | - | - | |
09 | 2.7135: Install occupancy sensors | $866 | $1,394 |
$618
9,086
kWh
|
$248
-
kW-mo/yr
|
- | - | - | |
10 | 3.4111: Use closed cycle process to minimize waste water production | $33,421 | $31,250 | - | - | - |
$33,421
-
Tgal
|
- | |
11 | 3.4111: Use closed cycle process to minimize waste water production | $7,430 | $500 | - | - | - |
$7,430
-
Tgal
|
- | |
12 | 3.2172: Use automatic cleaning equipment | $50,117 | $40,000 | - | - | - | - | $50,117 | |
13 | 3.2172: Use automatic cleaning equipment | $38,115 | - | - | - | - | - | $38,115 | |
14 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $18,650 | $11,000 | - | - | - | - | $18,650 | |
15 | 3.4111: Use closed cycle process to minimize waste water production | $26,004 | $25,000 | - | - | - |
$26,004
-
Tgal
|
- | |
16 | 4.321: Optimize production lot sizes and inventories | $2,244,000 | $3,448,800 | - | - | - | - | $2,244,000 | |
17 | 3.2176: Increase use of automation | $219,089 | $15,000 | - | - | - | - | $219,089 | |
TOTAL RECOMMENDED | $3,263,001 | $4,076,704 |
$498,865
7,338,219
kWh
|
$91,660
-
kW-mo/yr
|
$2,597
-
MMBtu
|
$66,855
-
Tgal
|
$2,603,024 | ||
TOTAL IMPLEMENTED | $372,875 | $149,404 |
$20,737
304,807
kWh
|
$6,832
-
kW-mo/yr
|
$2,597
-
MMBtu
|
$66,855
-
Tgal
|
$275,854 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs