ITAC Assessment: SD0156
ITAC logo
ITAC Assessment: SD0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Memory and output device chips
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 33,840
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $892,297 13,776,964
kWh
Electricity Demand $281,127 32,645
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,644

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2514: Cover open tanks $3,289 $521 $3,289
51,290
kWh
-
02 2.2511: Insulate bare equipment $3,632 $651 $3,632
56,858
kWh
-
03 2.4321: Upgrade obsolete equipment $1,278 $100 $1,278
19,930
kWh
-
04 2.7292: Lower ceiling to reduce conditioned space $2,794 $875 $2,794
43,669
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,515 $22,017 $10,515
116,061
kWh
-
06 2.7144: Install spectral reflectors / delamp $13,620 $12,370 $13,620
148,300
kWh
-
07 2.7135: Install occupancy sensors $4,356 $3,822 $4,356
43,669
kWh
-
08 3.1162: Use less wasteful packaging $360 $400 - $360
09 3.1175: Use a different or recycled raw material $800 $418 - $800
TOTAL RECOMMENDED $40,644 $41,174 $39,484
479,777
kWh
$1,160
TOTAL IMPLEMENTED $40,644 $41,174 $39,484
479,777
kWh
$1,160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs