| Assessment Year | 1996 |
|---|---|
| Principal Product | Memory and output device chips |
| NAICS |
n/a
|
| SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
33,840
ft2
|
| Annual Production | 10,000,000
units
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $892,297 | 13,776,964 |
kWh
|
$0.065 |
| Electricity Demand | $281,127 | 32,645 |
kW-mo/yr
|
$8.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,644 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,644 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $3,289 | $521 |
$3,289
51,290
kWh
|
- | |
| 02 | 2.2511: Insulate bare equipment | $3,632 | $651 |
$3,632
56,858
kWh
|
- | |
| 03 | 2.4321: Upgrade obsolete equipment | $1,278 | $100 |
$1,278
19,930
kWh
|
- | |
| 04 | 2.7292: Lower ceiling to reduce conditioned space | $2,794 | $875 |
$2,794
43,669
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,515 | $22,017 |
$10,515
116,061
kWh
|
- | |
| 06 | 2.7144: Install spectral reflectors / delamp | $13,620 | $12,370 |
$13,620
148,300
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $4,356 | $3,822 |
$4,356
43,669
kWh
|
- | |
| 08 | 3.1162: Use less wasteful packaging | $360 | $400 | - | $360 | |
| 09 | 3.1175: Use a different or recycled raw material | $800 | $418 | - | $800 | |
| TOTAL RECOMMENDED | $40,644 | $41,174 |
$39,484
479,777
kWh
|
$1,160 | ||
| TOTAL IMPLEMENTED | $40,644 | $41,174 |
$39,484
479,777
kWh
|
$1,160 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs