ITAC Assessment: SD0152
ITAC logo
ITAC Assessment: SD0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive Batteries
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 254,000
ft2
Annual Production 2,200,000
pieces
Production Hrs. Annual 6,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,604,769 26,303,928
kWh
Electricity Demand $383,479 60,471
kW-mo/yr
Electricity Fees $1,988,248 -
Natural Gas $113,358 50,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $5,249 $3,880 $5,249
73,271
kWh
- -
02 2.7145: Install skylights $4,543 $14,692 $4,543
41,325
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,155 $8,557 $5,155
71,805
kWh
- -
04 2.7144: Install spectral reflectors / delamp $11,009 $11,610 $11,009
150,059
kWh
- -
05 2.7135: Install occupancy sensors $3,443 $665 $3,443
47,479
kWh
- -
06 3.7211: Modify material application methods $1,920 $350 - $1,920
-
gal
-
07 3.8143: Recycle cleaning solvent and reuse $5,625 $50 - $5,625
-
gal
-
08 3.1191: Change procedures / equipment / operating conditions $15,600 - - - $15,600
TOTAL RECOMMENDED $52,544 $39,804 $29,399
383,939
kWh
$7,545
-
gal
$15,600
TOTAL IMPLEMENTED $52,544 $39,804 $29,399
383,939
kWh
$7,545
-
gal
$15,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs