ITAC Assessment: SD0150
ITAC logo
ITAC Assessment: SD0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plated Metals and Plastic Products
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 163,651
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,960
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $725,987 11,097,304
kWh
Electricity Demand $211,349 30,274
kW-mo/yr
Natural Gas $247,501 72,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings
01 2.4133: Use most efficient type of electric motors $18,102 $21,570 $18,102
199,590
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,242 $3,920 $2,242
31,653
kWh
- - -
03 2.1242: Minimize boiler blowdown with better feedwater treatment $10,042 $4,160 - $10,042
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $2,408 $3,077 - $2,408
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $7,368 $5,825 $7,368
75,615
kWh
- - -
06 3.4151: Minimize water usage $7,565 $3,410 - - $7,565
-
Tgal
-
07 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $34,791 $5,000 - - - $34,791
-
lb
TOTAL RECOMMENDED $82,518 $46,962 $27,712
306,858
kWh
$12,450
-
MMBtu
$7,565
-
Tgal
$34,791
-
lb
TOTAL IMPLEMENTED $75,150 $41,137 $20,344
231,243
kWh
$12,450
-
MMBtu
$7,565
-
Tgal
$34,791
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs