ITAC Assessment: SD0142
ITAC logo
ITAC Assessment: SD0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Croutons & Blended Snack Foods
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 130,000
ft2
Annual Production 2,275,000
lb
Production Hrs. Annual 7,350
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,726 1,257,913
kWh
Electricity Demand $18,446 2,514
kW-mo/yr
Electricity Fees $113,172 -
Natural Gas $93,950 15,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $2,866 $1,600 $2,866
32,825
kWh
- -
02 2.2437: Recover waste heat from equipment $1,410 $2,372 - $1,410
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,358 $9,951 $7,358
80,598
kWh
- -
04 2.7144: Install spectral reflectors / delamp $4,671 $5,250 $4,671
49,531
kWh
- -
05 2.7135: Install occupancy sensors $1,346 $1,230 $1,346
14,068
kWh
- -
06 3.1192: Reduce scrap production $21,840 $300 - - $21,840
-
lb
TOTAL RECOMMENDED $39,491 $20,703 $16,241
177,022
kWh
$1,410
-
MMBtu
$21,840
-
lb
TOTAL IMPLEMENTED $39,491 $20,703 $16,241
177,022
kWh
$1,410
-
MMBtu
$21,840
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs