Assessment Year | 1996 |
---|---|
Principal Product | Photovoltaic Cells, Modules & Systems |
NAICS |
n/a
|
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $5 M to 10M |
# of Employees | 103 |
Plant Area |
22,000
ft2
|
Annual Production | 1,000,000
lb
|
Production Hrs. Annual | 15,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $207,101 | 3,483,587 |
kWh
|
$0.059 |
Electricity Demand | $46,278 | 16,154 |
kW-mo/yr
|
$2.86 |
Natural Gas | $516 | 37 |
MMBtu
|
$13.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,991 | $3,350 |
$2,991
37,515
kWh
|
- | - | |
02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $2,747 | $2,500 |
$2,747
31,946
kWh
|
- | - | |
03 | 2.2514: Cover open tanks | $679 | $161 |
$679
6,448
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,979 | $1,860 |
$1,979
19,930
kWh
|
- | - | |
05 | 2.7144: Install spectral reflectors / delamp | $3,101 | $5,520 |
$3,101
31,360
kWh
|
- | - | |
06 | 3.4114: Replace city water with recycled water via cooling tower | $1,336 | $1,100 | - |
$1,336
-
gal
|
- | |
07 | 3.5314: Use in-process recycling whenever possible | $878 | $100 | - | - |
$878
-
lb
|
|
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $231 | $500 | - | - |
$231
-
lb
|
|
TOTAL RECOMMENDED | $13,942 | $15,091 |
$11,497
127,199
kWh
|
$1,336
-
gal
|
$1,109
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs