Assessment Year | 1996 |
---|---|
Principal Product | Zinc Die Casting |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
74,550
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 4,284
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,659 | 1,987,984 |
kWh
|
$0.089 |
Electricity Demand | $38,828 | 10,586 |
kW-mo/yr
|
$3.67 |
Electricity Fees | $1 | - |
|
- |
Natural Gas | $78,448 | 21,081 |
MMBtu
|
$3.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,536 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $6,481 | $7,830 |
$6,481
58,030
kWh
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $631 | $1,020 | - |
$631
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,082 | $2,568 |
$1,082
9,965
kWh
|
- | - | |
04 | 2.7144: Install spectral reflectors / delamp | $2,366 | $2,505 |
$2,366
21,688
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,076 | $1,034 |
$1,076
9,965
kWh
|
- | - | |
06 | 3.7211: Modify material application methods | $43,900 | $1,000 | - | - |
$43,900
-
lb
|
|
TOTAL RECOMMENDED | $55,536 | $15,957 |
$11,005
99,648
kWh
|
$631
-
MMBtu
|
$43,900
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs