ITAC Assessment: SD0133
ITAC logo
ITAC Assessment: SD0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Zinc Die Casting
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 74,550
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,284
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,659 1,987,984
kWh
Electricity Demand $38,828 10,586
kW-mo/yr
Electricity Fees $1 -
Natural Gas $78,448 21,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $6,481 $7,830 $6,481
58,030
kWh
- -
02 2.2414: Use waste heat from hot flue gases to preheat $631 $1,020 - $631
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,082 $2,568 $1,082
9,965
kWh
- -
04 2.7144: Install spectral reflectors / delamp $2,366 $2,505 $2,366
21,688
kWh
- -
05 2.7135: Install occupancy sensors $1,076 $1,034 $1,076
9,965
kWh
- -
06 3.7211: Modify material application methods $43,900 $1,000 - - $43,900
-
lb
TOTAL RECOMMENDED $55,536 $15,957 $11,005
99,648
kWh
$631
-
MMBtu
$43,900
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs