ITAC Assessment: SD0128
ITAC logo
ITAC Assessment: SD0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Fabricated Cushions
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 158
Plant Area 110,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,146 524,033
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,844 $2,200 $1,844
19,343
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $358 $20 $358
3,517
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,738 $2,595 $3,738
38,980
kWh
04 2.7144: Install spectral reflectors / delamp $13,201 $10,820 $13,201
136,284
kWh
05 2.7135: Install occupancy sensors $533 $607 $533
4,982
kWh
TOTAL RECOMMENDED $19,674 $16,242 $19,674
203,106
kWh
TOTAL IMPLEMENTED $19,674 $16,242 $19,674
203,106
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs