ITAC Assessment: SD0126
ITAC logo
ITAC Assessment: SD0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 35,000
ft2
Annual Production 35,000
units
Production Hrs. Annual 11,440
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,247 2,273,154
kWh
Natural Gas $4,203 456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $6,089 $5,020 $6,089
57,151
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,109 $15 $2,109
19,930
kWh
03 2.2437: Recover waste heat from equipment $662 $300 $662
6,155
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,277 $20,545 $15,277
141,559
kWh
05 2.7144: Install spectral reflectors / delamp $20,454 $12,500 $20,454
190,211
kWh
06 2.7135: Install occupancy sensors $1,119 $484 $1,119
10,258
kWh
TOTAL RECOMMENDED $45,710 $38,864 $45,710
425,264
kWh
TOTAL IMPLEMENTED $42,939 $38,549 $42,939
399,179
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs