ITAC Assessment: SD0123
ITAC logo
ITAC Assessment: SD0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bullets Proof Vests
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area 122,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 3,335
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,123 1,751,465
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,097 $1,939 $1,097
11,430
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $962 $20 $962
9,965
kWh
03 2.6242: Minimize operation of equipment maintained in standby condition $964 $350 $964
11,723
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,136 $12,362 $4,136
41,618
kWh
05 2.7144: Install spectral reflectors / delamp $4,955 $9,665 $4,955
49,531
kWh
06 2.7135: Install occupancy sensors $1,149 $1,789 $1,149
11,430
kWh
TOTAL RECOMMENDED $13,263 $26,125 $13,263
135,697
kWh
TOTAL IMPLEMENTED $13,263 $26,125 $13,263
135,697
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs