Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 1,000,000
thousand feet
Production Hrs. Annual 6,552
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,346 1,856,682
kWh
Natural Gas $29,607 4,506
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $5,107 $4,150 $5,107
54,513
kWh
- - -
02 2.2511: Insulate bare equipment $4,410 $4,925 - $4,410
-
MMBtu
- -
03 2.2136: Install / repair insulation on steam lines $2,610 $493 - $2,610
-
MMBtu
- -
04 2.4226: Use / purchase optimum sized compressor $1,483 $2,500 $1,483
15,826
kWh
- - -
05 2.2514: Cover open tanks $593 $227 - $593
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,196 $8,381 $5,196
55,393
kWh
- - -
07 2.7144: Install spectral reflectors / delamp $7,758 $6,675 $7,758
76,202
kWh
- - -
08 2.7135: Install occupancy sensors $995 $648 $995
9,672
kWh
- - -
09 2.7134: Use photocell controls $526 $300 $526
5,569
kWh
- - -
10 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $17,352 $7,000 - - $17,352
-
gal
-
11 3.5248: Separate and recycle scrap metal to foundry or for sale $936 - - - - $936
-
lb
12 3.5212: Regrind, reuse, or sell scrap plastic parts $600 - - - - $600
-
lb
TOTAL RECOMMENDED $47,566 $35,299 $21,065
217,175
kWh
$7,613
-
MMBtu
$17,352
-
gal
$1,536
-
lb
TOTAL IMPLEMENTED $24,283 $22,426 $19,544
201,934
kWh
$3,203
-
MMBtu
- $1,536
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs