| Assessment Year | 1995 |
|---|---|
| Principal Product | Spas |
| NAICS |
n/a
|
| SIC | 3088: Plastics Plumbing Fixtures |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
90,000
ft2
|
| Annual Production | 15,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $248,299 | 2,724,795 |
kWh
|
$0.091 |
| Natural Gas | $794 | 86 |
MMBtu
|
$9.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $49,469 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,630 | $2,690 |
$1,630
17,878
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $4,498 | $630 |
$4,498
49,238
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,318 | $20 |
$2,318
25,498
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,895 | $400 |
$1,895
20,809
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,676 | $10,950 |
$14,676
160,903
kWh
|
- | - | |
| 06 | 2.7144: Install spectral reflectors / delamp | $5,389 | $6,575 |
$5,389
54,513
kWh
|
- | - | |
| 07 | 2.7135: Install occupancy sensors | $2,552 | $1,559 |
$2,552
25,791
kWh
|
- | - | |
| 08 | 2.7134: Use photocell controls | $1,578 | $560 |
$1,578
15,240
kWh
|
- | - | |
| 09 | 3.8143: Recycle cleaning solvent and reuse | $14,753 | $10,000 | - |
$14,753
-
Tgal
|
- | |
| 10 | 3.1175: Use a different or recycled raw material | $180 | - | - | - |
$180
-
lb
|
|
| TOTAL RECOMMENDED | $49,469 | $33,384 |
$34,536
369,870
kWh
|
$14,753
-
Tgal
|
$180
-
lb
|
||
| TOTAL IMPLEMENTED | $49,469 | $33,384 |
$34,536
369,870
kWh
|
$14,753
-
Tgal
|
$180
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||