ITAC Assessment: SD0113
ITAC logo
ITAC Assessment: SD0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Dry Wall Finishing Products
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 116,600
ft2
Annual Production 11,000,000
pieces
Production Hrs. Annual 7,904
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $293,173 3,267,292
kWh
Natural Gas $1,082 117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $5,917 $4,630 $5,917
65,944
kWh
-
02 3.4115: Recover and reuse cooling water $306 $500 $(-9.0)
(-293)
kWh
$315
-
Tgal
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $611 $500 $611
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,078 $5,522 $2,078
24,033
kWh
-
05 2.7144: Install spectral reflectors / delamp $1,970 $2,510 $1,970
20,223
kWh
-
06 2.7135: Install occupancy sensors $1,557 $1,576 $1,557
15,826
kWh
-
07 2.7134: Use photocell controls $1,674 $106 $1,674
16,413
kWh
-
TOTAL RECOMMENDED $14,113 $15,344 $13,798
142,146
kWh
$315
-
Tgal
TOTAL IMPLEMENTED $12,250 $13,268 $12,250
126,613
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs