ITAC Assessment: SD0110
ITAC logo
ITAC Assessment: SD0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product High Power Supply Switches
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 43,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,463 1,172,626
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,147 - $6,147
-
kWh
02 2.2443: Re-use or recycle hot or cold process exhaust air $2,764 $2,310 $2,764
26,084
kWh
03 2.2443: Re-use or recycle hot or cold process exhaust air $878 $860 $878
8,206
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,654 $30,715 $12,654
116,354
kWh
05 2.7144: Install spectral reflectors / delamp $21,143 $16,440 $21,143
185,522
kWh
06 2.7135: Install occupancy sensors $3,279 $1,584 $3,279
28,722
kWh
TOTAL RECOMMENDED $46,865 $51,909 $46,865
364,888
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs