Assessment Year | 1995 |
---|---|
Principal Product | Composite Materials |
NAICS |
n/a
|
SIC | 3624: Carbon and Graphite Products |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
330,000
ft2
|
Annual Production | 600,000
lb
|
Production Hrs. Annual | 6,756
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $915,770 | 11,335,287 |
kWh
|
$0.081 |
Natural Gas | $186,890 | 49,990 |
MMBtu
|
$3.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $161,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,447 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $24,474 | $22,100 |
$24,474
303,048
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,382 | $9,800 |
$4,382
54,220
kWh
|
- | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $3,356 | $3,400 | - |
$3,356
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $83,952 | $150,000 | - |
$83,952
-
MMBtu
|
|
05 | 2.2522: Isolate hot or cold equipment | $890 | - |
$890
21,395
kWh
|
- | |
06 | 2.6218: Turn off equipment when not in use | $4,248 | $3,000 |
$4,248
52,462
kWh
|
- | |
07 | 2.1222: Install turbulators | $1,618 | $1,600 | - |
$1,618
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,523 | $23,647 |
$25,523
296,014
kWh
|
- | |
09 | 2.7144: Install spectral reflectors / delamp | $13,450 | $17,980 |
$13,450
148,300
kWh
|
- | |
TOTAL RECOMMENDED | $161,893 | $231,527 |
$72,967
875,439
kWh
|
$88,926
-
MMBtu
|
||
TOTAL IMPLEMENTED | $63,447 | $63,727 |
$63,447
747,362
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs