ITAC Assessment: SD0103
ITAC logo
ITAC Assessment: SD0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Carpets
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,584 1,953,400
kWh
Natural Gas $555,462 140,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $225,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $13,776 $14,090 $13,776
94,959
kWh
-
02 2.2511: Insulate bare equipment $10,901 $6,835 - $10,901
-
MMBtu
03 2.2514: Cover open tanks $62,441 $45,735 - $62,441
-
MMBtu
04 2.2437: Recover waste heat from equipment $65,923 $63,000 - $65,923
-
MMBtu
05 2.2449: Recover heat from exhausted steam, hot air or hot water $34,998 $20,000 - $34,998
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $27,668 - $27,668
-
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,708 $1,432 $9,708
66,530
kWh
-
TOTAL RECOMMENDED $225,415 $151,092 $51,152
161,489
kWh
$174,263
-
MMBtu
TOTAL IMPLEMENTED $51,152 $15,522 $51,152
161,489
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs