ITAC Assessment: SD0101
ITAC logo
ITAC Assessment: SD0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Honeycomb Panels
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 76,000
ft2
Annual Production 7,200,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,408 1,002,931
kWh
Natural Gas $7,983 1,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,634 $1,990 $1,634
13,775
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $282 $240 $282
2,345
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,448 $2,812 $1,448
12,309
kWh
04 2.7144: Install spectral reflectors / delamp $2,111 $1,635 $2,111
16,706
kWh
05 2.7135: Install occupancy sensors $713 $591 $713
5,569
kWh
06 2.7134: Use photocell controls $1,828 $1,712 $1,828
15,533
kWh
TOTAL RECOMMENDED $8,016 $8,980 $8,016
66,237
kWh
TOTAL IMPLEMENTED $8,016 $8,980 $8,016
66,237
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs