ITAC Assessment: SD0096
ITAC logo
ITAC Assessment: SD0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Injection Molded Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,187 7,966,296
kWh
Natural Gas $52,296 9,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $29,182 $22,260 $29,182
411,196
kWh
02 2.2614: Use cooling tower or economizer to replace chiller cooling $18,252 $73,354 $18,252
257,327
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,565 - $5,565
-
kWh
04 2.2614: Use cooling tower or economizer to replace chiller cooling $90,168 $27,490 $90,168
1,270,516
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,631 $11,471 $14,631
197,245
kWh
06 2.7144: Install spectral reflectors / delamp $6,477 $5,450 $6,477
79,426
kWh
07 2.7135: Install occupancy sensors $706 $616 $706
8,792
kWh
TOTAL RECOMMENDED $164,981 $140,641 $164,981
2,224,502
kWh
TOTAL IMPLEMENTED $43,813 $33,731 $43,813
608,441
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs