ITAC Assessment: SD0085
ITAC logo
ITAC Assessment: SD0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Medical Instruments and Supplies
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 250,000
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $829,136 9,985,639
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $37,498 $31,040 $37,498
451,641
kWh
02 2.2511: Insulate bare equipment $432 $476 $432
5,275
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $35,438 $27,832 $35,438
413,247
kWh
04 2.7144: Install spectral reflectors / delamp $28,669 $20,300 $28,669
318,875
kWh
05 2.7145: Install skylights $8,650 $27,820 $8,650
95,545
kWh
TOTAL RECOMMENDED $110,687 $107,468 $110,687
1,284,583
kWh
TOTAL IMPLEMENTED $102,037 $79,648 $102,037
1,189,038
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs