| Assessment Year | 1994 |
|---|---|
| Principal Product | Hot Mix Asphalt &Emulsion |
| NAICS |
n/a
|
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 15 |
| Plant Area |
3,354,120
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,865
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $198,128 | 1,710,727 |
kWh
|
$0.12 |
| Natural Gas | $345,740 | 94,864 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,195 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,244 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $3,982 | $19,450 |
$3,982
31,067
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $520 | $250 |
$520
3,517
kWh
|
- | |
| 03 | 2.5194: Redesign process | $10,355 | $200,000 |
$10,355
117,526
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $288 | $1,350 | - |
$288
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $454 | $933 | - |
$454
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $1,905 | $5,085 | - |
$1,905
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,134 | $5,274 |
$3,134
26,084
kWh
|
- | |
| 08 | 2.7144: Install spectral reflectors / delamp | $4,417 | $5,080 |
$4,417
35,170
kWh
|
- | |
| 09 | 2.7135: Install occupancy sensors | $2,140 | $4,520 |
$2,140
17,292
kWh
|
- | |
| TOTAL RECOMMENDED | $27,195 | $241,942 |
$24,548
230,656
kWh
|
$2,647
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,244 | $21,983 |
$4,502
34,584
kWh
|
$742
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs