ITAC Assessment: SD0084
ITAC logo
ITAC Assessment: SD0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Hot Mix Asphalt &Emulsion
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 3,354,120
ft2
Annual Production 0
units
Production Hrs. Annual 7,865
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,128 1,710,727
kWh
Natural Gas $345,740 94,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,982 $19,450 $3,982
31,067
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $520 $250 $520
3,517
kWh
-
03 2.5194: Redesign process $10,355 $200,000 $10,355
117,526
kWh
-
04 2.2511: Insulate bare equipment $288 $1,350 - $288
-
MMBtu
05 2.2511: Insulate bare equipment $454 $933 - $454
-
MMBtu
06 2.2511: Insulate bare equipment $1,905 $5,085 - $1,905
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,134 $5,274 $3,134
26,084
kWh
-
08 2.7144: Install spectral reflectors / delamp $4,417 $5,080 $4,417
35,170
kWh
-
09 2.7135: Install occupancy sensors $2,140 $4,520 $2,140
17,292
kWh
-
TOTAL RECOMMENDED $27,195 $241,942 $24,548
230,656
kWh
$2,647
-
MMBtu
TOTAL IMPLEMENTED $5,244 $21,983 $4,502
34,584
kWh
$742
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs