| Assessment Year | 1994 |
|---|---|
| Principal Product | Medical Diagnostic Equip. |
| NAICS |
n/a
|
| SIC | 2835: In Vitro and In Vivo Diagnostic Substances |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
242,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $913,690 | 11,866,647 |
kWh
|
$0.077 |
| Natural Gas | $164,672 | 32,799 |
MMBtu
|
$5.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,938 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $5,070 | $3,970 |
$5,070
65,944
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,732 | $20 |
$1,732
22,567
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $263 | $512 | - |
$263
-
MMBtu
|
|
| 04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $7,814 | $1,235 | - |
$7,814
-
MMBtu
|
|
| 05 | 2.2425: Use flue gases to heat process or service water | $3,031 | $3,180 | - |
$3,031
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,666 | $1,516 |
$1,666
21,688
kWh
|
- | |
| 07 | 2.7144: Install spectral reflectors / delamp | $1,072 | $2,416 |
$1,072
12,603
kWh
|
- | |
| 08 | 2.7132: Install timers on light switches in little used areas | $231 | $175 |
$231
2,931
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $457 | $552 |
$457
5,569
kWh
|
- | |
| 10 | 2.7135: Install occupancy sensors | $1,267 | $3,760 |
$1,267
16,413
kWh
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,149 | $630 |
$1,149
5,275
kWh
|
- | |
| TOTAL RECOMMENDED | $23,752 | $17,966 |
$12,644
152,990
kWh
|
$11,108
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,938 | $16,731 |
$12,644
152,990
kWh
|
$3,294
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs