ITAC Assessment: SD0056
ITAC logo
ITAC Assessment: SD0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PAPERBOARD CARTONS
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area
n/a
Annual Production 384,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $595,435 7,061,548
kWh
Natural Gas $34,856 5,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,009 $978 $1,009
12,016
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,029 $300 $3,029
36,049
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,097 - $4,392
52,169
kWh
$(-295.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,700 $199 $1,127
13,482
kWh
$573
05 2.7144: Install spectral reflectors / delamp $6,987 $20,500 $6,531
77,374
kWh
$456
06 2.6232: Install set-back timers $2,408 $2,880 $2,007
23,740
kWh
$401
TOTAL RECOMMENDED $19,230 $24,857 $18,095
214,830
kWh
$1,135
TOTAL IMPLEMENTED $5,106 $978 $5,401
64,185
kWh
$(-295.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs