| Assessment Year | 1991 |
|---|---|
| Principal Product | WELDED TUBING |
| NAICS |
n/a
|
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $5 M to 10M |
| # of Employees | 65 |
| Plant Area |
n/a
|
| Annual Production | 250
thousand feet
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,165 | 716,002 |
kWh
|
$0.091 |
| Natural Gas | $23,176 | 3,837 |
MMBtu
|
$6.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,867 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $223 | $243 |
$223
2,345
kWh
|
- | - | |
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,105 | $2,338 | - |
$1,105
-
MMBtu
|
- | |
| 03 | 2.2514: Cover open tanks | $1,377 | $600 | - |
$1,377
-
MMBtu
|
- | |
| 04 | 2.6232: Install set-back timers | $464 | $600 |
$244
2,345
kWh
|
- | $220 | |
| 05 | 2.7123: Keep lamps and reflectors clean | $560 | $660 |
$513
5,569
kWh
|
- | $47 | |
| 06 | 2.7123: Keep lamps and reflectors clean | $1,864 | $6,280 |
$1,679
18,464
kWh
|
- | $185 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $213 | $160 |
$137
1,465
kWh
|
- | $76 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $61 | $78 |
$61
586
kWh
|
- | - | |
| TOTAL RECOMMENDED | $5,867 | $10,959 |
$2,857
30,774
kWh
|
$2,482
-
MMBtu
|
$528 | ||
| TOTAL IMPLEMENTED | $5,867 | $10,959 |
$2,857
30,774
kWh
|
$2,482
-
MMBtu
|
$528 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs