ITAC Assessment: RU0120
ITAC logo
ITAC Assessment: RU0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FORGED METALS
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 6,000
ton
Production Hrs. Annual 4,336
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,394 3,432,005
kWh
Natural Gas $252,920 60,084
MMBtu
Fuel Oil #2 $39,996 7,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $922 - $922
12,016
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $560 $136 $560
7,327
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,940 - $4,940
63,892
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $23,037 $113,640 - $23,037
-
MMBtu
05 2.4133: Use most efficient type of electric motors $853 $11,328 $853
11,137
kWh
-
TOTAL RECOMMENDED $30,312 $125,104 $7,275
94,372
kWh
$23,037
-
MMBtu
TOTAL IMPLEMENTED - - - -