| Assessment Year | 1991 |
|---|---|
| Principal Product | FORGED METALS |
| NAICS |
n/a
|
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
n/a
|
| Annual Production | 6,000
ton
|
| Production Hrs. Annual | 4,336
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $265,394 | 3,432,005 |
kWh
|
$0.077 |
| Natural Gas | $252,920 | 60,084 |
MMBtu
|
$4.21 |
| Fuel Oil #2 | $39,996 | 7,809 |
MMBtu
|
$5.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $922 | - |
$922
12,016
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $560 | $136 |
$560
7,327
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,940 | - |
$4,940
63,892
kWh
|
- | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $23,037 | $113,640 | - |
$23,037
-
MMBtu
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $853 | $11,328 |
$853
11,137
kWh
|
- | |
| TOTAL RECOMMENDED | $30,312 | $125,104 |
$7,275
94,372
kWh
|
$23,037
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs