ITAC Assessment: PV0003
ITAC logo
ITAC Assessment: PV0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FABRICATED STEEL PRODUCT
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $500
k
to 1
M
# of Employees 13
Plant Area
n/a
Annual Production 900
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,685 50,703
kWh
Natural Gas $1,900 293
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $478 - $478
5,275
kWh
-
02 2.7231: Use radiant heater for spot heating $253 $1,650 - $253
-
MMBtu
TOTAL RECOMMENDED $731 $1,650 $478
5,275
kWh
$253
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs