ITAC Assessment: ORC016
ITAC logo
ITAC Assessment: ORC016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 20
Plant Area 35,720
ft2
Annual Production 100
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,976 283,953
kWh
Electricity Demand $5,658 775
kW-mo/yr
Natural Gas $71,618 8,581
MMBtu
Other Energy $315 76
MMBtu
TOTAL YEARLY COSTS $196,567
RECOMMENDED SAVINGS* $112,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,757 $18,123 $6,722
16,004
kWh
$35
-
kW-mo/yr
-
02 2.2113: Repair or replace steam traps $14,324 $1,894 - - $14,324
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $90,790 $266,383 $46,605
111,230
kWh
- $44,185
-
MMBtu
04 2.6211: Conserve energy by efficient use of vending machines $838 $7,000 $838
2,000
kWh
- -
TOTAL RECOMMENDED $112,708 $293,400 $54,165
129,234
kWh
$35
-
kW-mo/yr
$58,509
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs