ITAC Assessment: ORC015
ITAC logo
ITAC Assessment: ORC015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product government support
NAICS 921190: Other General Government Support
SIC 7991: Physical Fitness Facilities
Sales Range less than $500
k
# of Employees 5
Plant Area 20,000
ft2
Annual Production 1
units
Production Hrs. Annual 1,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,526 160,640
kWh
Electricity Demand $11,526 418
kW-mo/yr
Natural Gas $3,519 297
MMBtu
TOTAL YEARLY COSTS $26,571
RECOMMENDED SAVINGS* $2,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,048 $26,865 $941
13,121
kWh
$107
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $279 $512 $279
3,892
kWh
- -
03 2.7226: Use computer programs to optimize hvac performance $1,053 $5,400 $807
11,245
kWh
- $246
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39 $750 $39
539
kWh
- -
05 2.2511: Insulate bare equipment $164 $100 $164
2,287
kWh
- -
TOTAL RECOMMENDED $2,583 $33,627 $2,230
31,084
kWh
$107
-
kW-mo/yr
$246
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs