ITAC Assessment: ORC007
ITAC logo
ITAC Assessment: ORC007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Support services
NAICS 922110: Courts
SIC 8111: Legal Services
Sales Range less than $500
k
# of Employees 400
Plant Area 98,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,747 797,000
kWh
Electricity Demand $24,025 3,585
kW-mo/yr
Electricity Fees $14,677 -
Natural Gas $15,898 1,496
MMBtu
TOTAL YEARLY COSTS $101,347
RECOMMENDED SAVINGS* $17,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $765 $5,150 $765
12,750
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,853 $26,400 $5,644
96,830
kWh
$209
-
kW-mo/yr
-
03 2.7314: Reduce ventilation air $3,082 $200 $802
13,666
kWh
- $2,280
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $808 $50 - - $808
-
MMBtu
05 2.7242: Change zone reheat coils to variable air volume boxes $2,696 $200 $2,696
45,970
kWh
- -
06 2.7234: Use heat pump for space conditioning $535 $5,000 $414
7,060
kWh
$121
-
kW-mo/yr
-
07 2.1224: Replace boiler $3,485 $30,000 - - $3,485
-
MMBtu
TOTAL RECOMMENDED $17,224 $67,000 $10,321
176,276
kWh
$330
-
kW-mo/yr
$6,573
-
MMBtu
TOTAL IMPLEMENTED $6,586 $450 $3,498
59,636
kWh
- $3,088
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs