ITAC Assessment: ORC006
ITAC logo
ITAC Assessment: ORC006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Support Sercices
NAICS 611210: Junior Colleges
SIC 8222: Junior Colleges and Technical Institutes
Sales Range less than $500
k
# of Employees 100
Plant Area 100,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,784 1,417,200
kWh
Electricity Demand $5,606 4,115
kW-mo/yr
Electricity Fees $26,227 -
Natural Gas $18,063 2,195
MMBtu
Waste Disposal Costs
Water Usage $8,209 459
Tgal
TOTAL YEARLY COSTS $102,889
RECOMMENDED SAVINGS* $11,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,080 $12,000 $1,066
33,732
kWh
$14
-
kW-mo/yr
- -
02 2.7314: Reduce ventilation air $8,470 $1,000 $1,664
52,671
kWh
- $6,806
-
MMBtu
-
03 2.2515: Use optimum thickness insulation $72 $100 $72
2,287
kWh
- - -
04 3.4151: Minimize water usage $1,964 $8,000 - - - $1,964
-
Tgal
TOTAL RECOMMENDED $11,586 $21,100 $2,802
88,690
kWh
$14
-
kW-mo/yr
$6,806
-
MMBtu
$1,964
-
Tgal
TOTAL IMPLEMENTED $1,964 $8,000 - - - $1,964
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs