ITAC Assessment: OR0817
ITAC logo
ITAC Assessment: OR0817
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 5,000,000
ft2
Annual Production 74,000
ton
Production Hrs. Annual 1,820
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,196 561,924
kWh
Electricity Demand $88,532 4,904
kW-mo/yr
Electricity Fees $29,585 -
Natural Gas $67,799 28,278
MMBtu
TOTAL YEARLY COSTS $215,112
RECOMMENDED SAVINGS* $56,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,616 - $597
11,497
kWh
$1,019
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,046 $1,106 $3,965
76,031
kWh
$9,081
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $42,138 $218,000 $28,926
556,733
kWh
$13,212
-
kW-mo/yr
TOTAL RECOMMENDED $56,800 $219,106 $33,488
644,261
kWh
$23,312
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs