| Assessment Year | 2025 |
|---|---|
| Principal Product | Asphalt |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
5,000,000
ft2
|
| Annual Production | 74,000
ton
|
| Production Hrs. Annual | 1,820
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,196 | 561,924 |
kWh
|
$0.052 |
| Electricity Demand | $88,532 | 4,904 |
kW-mo/yr
|
$18.05 |
| Electricity Fees | $29,585 | - |
|
- |
| Natural Gas | $67,799 | 28,278 |
MMBtu
|
$2.40 |
| TOTAL YEARLY COSTS | $215,112 | |||
| RECOMMENDED SAVINGS* | $56,800 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,616 | - |
$597
11,497
kWh
|
$1,019
-
kW-mo/yr
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,046 | $1,106 |
$3,965
76,031
kWh
|
$9,081
-
kW-mo/yr
|
|
| 03 | 2.9114: Use solar heat to make electricty | $42,138 | $218,000 |
$28,926
556,733
kWh
|
$13,212
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $56,800 | $219,106 |
$33,488
644,261
kWh
|
$23,312
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs