ITAC Assessment: OR0812
ITAC logo
ITAC Assessment: OR0812
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Specialized Systems
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 70,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,595 950,100
kWh
Electricity Demand $29,856 2,550
kW-mo/yr
Electricity Fees $10,547 -
Natural Gas $36,977 3,233
MMBtu
TOTAL YEARLY COSTS $150,975
RECOMMENDED SAVINGS* $29,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,549 $373 $1,446
18,669
kWh
$1,103
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,333 $510 $843
10,888
kWh
$490
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $25,841 $172,847 $17,745
229,078
kWh
$8,096
-
kW-mo/yr
TOTAL RECOMMENDED $29,723 $173,730 $20,034
258,635
kWh
$9,689
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs