Assessment Year | 2025 |
---|---|
Principal Product | plastic tubing, metal cables, and metal wire for medical devices |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
260,000
ft2
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $378,909 | 5,900,700 |
kWh
|
$0.064 | |
Electricity Demand | $188,302 | 11,502 |
kW-mo/yr
|
$16.37 | |
Electricity Fees | $42,299 | - |
|
- | |
Natural Gas | $15,281 | 1,125 |
MMBtu
|
$13.58 | |
Waste Disposal Costs | |||||
Water Usage | $23,739 | 3,829 |
Tgal
|
$6.20 | |
Water Disposal | $47,506 | 3,829 |
Tgal
|
$12.41 | |
TOTAL YEARLY COSTS | $696,036 | ||||
RECOMMENDED SAVINGS* | $82,383 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $56,788 | $960,069 |
$48,793
759,513
kWh
|
$7,995
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,490 | $1,927 |
$3,291
51,254
kWh
|
$1,199
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $3,880 | $211 |
$2,525
39,331
kWh
|
$1,354
-
kW-mo/yr
|
- | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $1,542 | $5,699 |
$1,143
17,801
kWh
|
$399
-
kW-mo/yr
|
- | |
05 | 4.212: Adopt in-house material generation | $15,683 | $76,301 |
$(-2,114.7)
(-32,935)
kWh
|
$(-1,078.3)
-
kW-mo/yr
|
$18,876 | |
TOTAL RECOMMENDED | $82,383 | $1,044,207 |
$53,638
834,965
kWh
|
$9,869
-
kW-mo/yr
|
$18,876 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs