ITAC Assessment: OR0806
ITAC logo
ITAC Assessment: OR0806
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product plastic tubing, metal cables, and metal wire for medical devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 260,000
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $378,909 5,900,700
kWh
Electricity Demand $188,302 11,502
kW-mo/yr
Electricity Fees $42,299 -
Natural Gas $15,281 1,125
MMBtu
Waste Disposal Costs
Water Usage $23,739 3,829
Tgal
Water Disposal $47,506 3,829
Tgal
TOTAL YEARLY COSTS $696,036
RECOMMENDED SAVINGS* $82,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $56,788 $960,069 $48,793
759,513
kWh
$7,995
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,490 $1,927 $3,291
51,254
kWh
$1,199
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $3,880 $211 $2,525
39,331
kWh
$1,354
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $1,542 $5,699 $1,143
17,801
kWh
$399
-
kW-mo/yr
-
05 4.212: Adopt in-house material generation $15,683 $76,301 $(-2,114.7)
(-32,935)
kWh
$(-1,078.3)
-
kW-mo/yr
$18,876
TOTAL RECOMMENDED $82,383 $1,044,207 $53,638
834,965
kWh
$9,869
-
kW-mo/yr
$18,876
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs