ITAC Assessment: OR0768
ITAC logo
ITAC Assessment: OR0768
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 50,000
ft2
Annual Production 17,500,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,584 2,656,800
kWh
Electricity Demand $46,080 5,358
kW-mo/yr
Electricity Fees $23,303 -
Natural Gas $333,629 38,231
MMBtu
Waste Disposal Costs
Water Usage $81,563 8,924
Tgal
Solid Waste (non-haz) $11,116 188,000
lb
TOTAL YEARLY COSTS $656,275
RECOMMENDED SAVINGS* $54,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $18,535 $8,125 $12,446
205,927
kWh
$6,089
-
kW-mo/yr
-
02 3.1194: Use automatic flow control $24,867 $9,600 $3,011
49,818
kWh
- $21,856
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $11,178 $5,693 - - $11,178
-
MMBtu
TOTAL RECOMMENDED $54,580 $23,418 $15,457
255,745
kWh
$6,089
-
kW-mo/yr
$33,034
-
MMBtu
TOTAL IMPLEMENTED $29,713 $13,818 $12,446
205,927
kWh
$6,089
-
kW-mo/yr
$11,178
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs