ITAC Assessment: OR0754
ITAC logo
ITAC Assessment: OR0754
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Industrial Equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 120,000
ft2
Annual Production 80
units
Production Hrs. Annual 6,375
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,731 1,934,320
kWh
Electricity Demand $53,433 6,935
kW-mo/yr
Electricity Fees $2,631 -
Natural Gas $74,515 10,742
MMBtu
Waste Disposal Costs
Water Usage $16,681 1,217
Tgal
Other Liquid (non-haz) $6,503 210
gal
Solid Waste (non-haz) $37,083 56,400
lb
TOTAL YEARLY COSTS $316,577
RECOMMENDED SAVINGS* $19,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $4,871 $2,675 $4,871
74,945
kWh
- - - -
02 2.4322: Use or replace with energy efficient substitutes $1,033 $3,560 $663
10,200
kWh
$370
-
kW-mo/yr
- - -
03 3.5111: Filter and reuse hydraulic oil $13,859 $65,000 - - $32
-
Tgal
$6,503
-
gal
$7,324
TOTAL RECOMMENDED $19,763 $71,235 $5,534
85,145
kWh
$370
-
kW-mo/yr
$32
-
Tgal
$6,503
-
gal
$7,324
TOTAL IMPLEMENTED $5,904 $6,235 $5,534
85,145
kWh
$370
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs