ITAC Assessment: OR0726
ITAC logo
ITAC Assessment: OR0726
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Resonators
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 14,000
ft2
Annual Production 484
units
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,158 1,169,739
kWh
Electricity Demand $8,828 2,445
kW-mo/yr
Electricity Fees $14,166 -
Natural Gas $5,000 916
MMBtu
TOTAL YEARLY COSTS $117,152
RECOMMENDED SAVINGS* $9,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,581 $7,570 $4,113
56,808
kWh
$851
-
kW-mo/yr
- $813 $(-196.0)
02 2.7314: Reduce ventilation air $1,259 - $1,259
17,383
kWh
- - - -
03 2.2437: Recover waste heat from equipment $3,031 $3,570 $156
2,156
kWh
- $2,875
-
MMBtu
- -
TOTAL RECOMMENDED $9,871 $11,140 $5,528
76,347
kWh
$851
-
kW-mo/yr
$2,875
-
MMBtu
$813 $(-196.0)
TOTAL IMPLEMENTED $6,840 $7,570 $5,372
74,191
kWh
$851
-
kW-mo/yr
- $813 $(-196.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs