ITAC Assessment: CO0476
ITAC logo
ITAC Assessment: CO0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product aluminum sheet
NAICS
n/a
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 43,270,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $413,362 34,938,160
kWh
Electricity Demand $970,899 6,579
kW-mo/yr
Electricity Fees $1,860 -
Natural Gas $1,765,093 641,512
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3191: Use demand controller or load shedder $7,380 $20,000 - $7,380
-
kW-mo/yr
- - - - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,240 $2,400 $2,410
203,986
kWh
$3,430
-
kW-mo/yr
- - - - - $(-2,600.0) - -
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $2,310 $1,000 - - $2,310
-
MMBtu
- - - - - - -
04 3.3131: Use evaporation to concentrate material $62,600 $18,400 - $(-90.0)
-
kW-mo/yr
$(-6,700.0)
-
MMBtu
- $76,690
-
gal
- - $(-7,300.0) - -
05 3.8142: Distill contaminated solvents for reuse $16,290 $13,500 - $(-60.0)
-
kW-mo/yr
- - - $2,890
-
gal
- $(-2,380.0) $15,840 -
06 3.6112: Use filter and drying oven to reduce sludge volume $6,490 $41,000 - - $(-1,730.0)
-
MMBtu
$(-310.0)
-
Tgal
- - $9,110
-
lb
- - $(-580.0)
-
Tgal
TOTAL RECOMMENDED $98,310 $96,300 $2,410
203,986
kWh
$10,660
-
kW-mo/yr
$(-6,120.0)
-
MMBtu
$(-310.0)
-
Tgal
$76,690
-
gal
$2,890
-
gal
$9,110
-
lb
$(-12,280.0) $15,840 $(-580.0)
-
Tgal
TOTAL IMPLEMENTED $68,150 $21,800 $2,410
203,986
kWh
$3,340
-
kW-mo/yr
$(-4,390.0)
-
MMBtu
- $76,690
-
gal
- - $(-9,900.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs