ITAC Assessment: OR0725
ITAC logo
ITAC Assessment: OR0725
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 40,000
ft2
Annual Production 18,500
units
Production Hrs. Annual 6,916
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,425 559,870
kWh
Electricity Demand $9,324 1,745
kW-mo/yr
Electricity Fees $6,287 -
Natural Gas $39,885 7,620
MMBtu
LPG $3,500 200
MMBtu
Other Gas $4,750 1
MMBtu
Waste Disposal Costs
Water Usage $17,287 4,333
Tgal
Water Disposal $41,396 4,333
Tgal
Other Liquid (non-haz) $2,282 1
gal
TOTAL YEARLY COSTS $163,136
RECOMMENDED SAVINGS* $203,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $184,656

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings Primary Product Savings By-product Production Savings
01 4.131: Modify process to reduce material use/cost $16,581 $12,780 $(-110.0)
(-1,598)
kWh
- - $1,690 - $15,001 -
02 3.5311: Recover and reuse waste material $58,445 $110,790 $(-2,638.0)
(-38,255)
kWh
- - $61,083 - - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $126,211 $375,000 - - - - $156,211 - $(-30,000.0)
04 2.1224: Replace boiler $2,159 - $(-2,036.0)
(-29,526)
kWh
$(-506.0)
-
kW-mo/yr
$4,701
-
MMBtu
- - - -
TOTAL RECOMMENDED $203,396 $498,570 $(-4,784.0)
(-69,379)
kWh
$(-506.0)
-
kW-mo/yr
$4,701
-
MMBtu
$62,773 $156,211 $15,001 $(-30,000.0)
TOTAL IMPLEMENTED $184,656 $485,790 $(-2,638.0)
(-38,255)
kWh
- - $61,083 $156,211 - $(-30,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs