Assessment Year | 2019 |
---|---|
Principal Product | Industrial Asphalt, Paving Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
522,720
ft2
|
Annual Production | 130,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $222,744 | 3,411,418 |
kWh
|
$0.065 | |
Electricity Demand | $3 | 1 |
kW-mo/yr
|
$2.61 | |
Electricity Fees | $2,980 | - |
|
- | |
Natural Gas | $573,986 | 160,668 |
MMBtu
|
$3.57 | |
Waste Disposal Costs | |||||
Water Usage | $45,974 | 7,644 |
Tgal
|
$6.01 | |
TOTAL YEARLY COSTS | $845,687 | ||||
RECOMMENDED SAVINGS* | $18,891 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $4,152 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $4,573 | $5,513 | - | - |
$4,573
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $10,166 | $71,155 | - | - |
$10,166
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,204 | - |
$2,827
42,646
kWh
|
$377
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $948 | - |
$927
13,989
kWh
|
$21
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $18,891 | $76,668 |
$3,754
56,635
kWh
|
$398
-
kW-mo/yr
|
$14,739
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,152 | - |
$3,754
56,635
kWh
|
$398
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs