ITAC Assessment: OR0715
ITAC logo
ITAC Assessment: OR0715
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Industrial Asphalt, Paving Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 522,720
ft2
Annual Production 130,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,744 3,411,418
kWh
Electricity Demand $3 1
kW-mo/yr
Electricity Fees $2,980 -
Natural Gas $573,986 160,668
MMBtu
Waste Disposal Costs
Water Usage $45,974 7,644
Tgal
TOTAL YEARLY COSTS $845,687
RECOMMENDED SAVINGS* $18,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $4,573 $5,513 - - $4,573
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $10,166 $71,155 - - $10,166
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,204 - $2,827
42,646
kWh
$377
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $948 - $927
13,989
kWh
$21
-
kW-mo/yr
-
TOTAL RECOMMENDED $18,891 $76,668 $3,754
56,635
kWh
$398
-
kW-mo/yr
$14,739
-
MMBtu
TOTAL IMPLEMENTED $4,152 - $3,754
56,635
kWh
$398
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs