ITAC Assessment: OR0714
ITAC logo
ITAC Assessment: OR0714
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Conditioned Air Space
NAICS 561920: Convention and Trade Show Organizers
SIC 7389: Business Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 868,000
ft2
Annual Production 868,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,385 5,388,080
kWh
Electricity Demand $187,287 23,697
kW-mo/yr
Electricity Fees $84,551 -
Natural Gas $86,215 10,263
MMBtu
Waste Disposal Costs
Water Usage $9,839 1,505
Tgal
TOTAL YEARLY COSTS $650,277
RECOMMENDED SAVINGS* $127,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $56,799 $168,000 $43,965
736,314
kWh
- $12,834
-
MMBtu
02 2.7226: Use computer programs to optimize hvac performance $40,772 $23,842 $21,645
362,495
kWh
- $19,127
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $21,372 $29,440 $10,899
182,535
kWh
$10,473
-
kW-mo/yr
-
04 2.4131: Size electric motors for peak operating efficiency $6,441 $23,733 $5,118
85,706
kWh
$1,323
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $1,732 $10,902 - - $1,732
-
MMBtu
TOTAL RECOMMENDED $127,116 $255,917 $81,627
1,367,050
kWh
$11,796
-
kW-mo/yr
$33,693
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs