ITAC Assessment: OR0702
ITAC logo
ITAC Assessment: OR0702
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Aerospace Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 108,000
ft2
Annual Production 114,996
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,907 2,794,020
kWh
Electricity Demand $82,574 8,739
kW-mo/yr
Electricity Fees $17,102 -
Natural Gas $77,979 9,441
MMBtu
TOTAL YEARLY COSTS $340,562
RECOMMENDED SAVINGS* $34,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 4.121: Maintain clean conditions before painting $20,800 $7,140 - - $20,800
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,088 $660 $5,088
86,524
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $3,409 $1,005 $3,409
49,773
kWh
- -
04 2.1113: Reduce combustion air flow to optimum $5,065 $5,807 - $5,065
-
MMBtu
-
TOTAL RECOMMENDED $34,362 $14,612 $8,497
136,297
kWh
$5,065
-
MMBtu
$20,800
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs