ITAC Assessment: MAS013
ITAC logo
ITAC Assessment: MAS013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Paper Manufacturing and Converting
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 28,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $891,715 23,114,900
kWh
Electricity Demand $1,305,318 112,907
kW-mo/yr
Fuel Oil #6 $1,898,000 143,782
MMBtu
Other Energy $1,483,000 96,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Other Energy Savings Ancillary Material Cost Savings
01 2.4321: Upgrade obsolete equipment $27,730 $42,112 $(-42,818.0)
(-742,074)
kWh
$(-15,524.0)
-
kW-mo/yr
$65,072
-
MMBtu
- $21,000
02 2.4131: Size electric motors for peak operating efficiency $21,255 $20,475 $21,255
368,363
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,053 - $8,608
149,200
kWh
$3,445
-
kW-mo/yr
- - -
04 2.4131: Size electric motors for peak operating efficiency $7,289 $15,000 $7,289
126,311
kWh
- - - -
05 2.2511: Insulate bare equipment $3,878 $3,600 - - - $3,878
-
MMBtu
-
06 2.4131: Size electric motors for peak operating efficiency $3,738 $8,000 $3,738
64,780
kWh
- - - -
07 2.6213: Turn off steam / hot water lines leading to space heating units $2,115 $150 - - - $2,115
-
MMBtu
-
08 2.4131: Size electric motors for peak operating efficiency $942 $5,000 $942
16,320
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $784 $3,500 $565
9,792
kWh
$219
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $79,784 $97,837 $(-421.0)
(-7,308)
kWh
$(-11,860.0)
-
kW-mo/yr
$65,072
-
MMBtu
$5,993
-
MMBtu
$21,000
TOTAL IMPLEMENTED $43,823 $35,725 $34,166
592,135
kWh
$3,664
-
kW-mo/yr
- $5,993
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Other Energy Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs