ITAC Assessment: LM0012
ITAC logo
ITAC Assessment: LM0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product heat treatment jobshop
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 100,000
ft2
Annual Production 803,250
pieces
Production Hrs. Annual 7,112
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,659 4,669,557
kWh
Electricity Demand $120,750 34,596
kW-mo/yr
Electricity Fees $18,213 -
Natural Gas $182,314 26,822
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.7145: Install skylights $2,320 $1,700 $2,320
19,621
kWh
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $9,287 $8,000 - - $9,287
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $377 $111 $331
3,033
kWh
$46
-
kW-mo/yr
- - -
04 4.426: Modify workload $10,144 $3,750 - - - $10,144 -
05 4.423: Move product using mechanical means $1,838 $3,350 - - - - $1,838
06 4.431: Train operators for maximum operating efficiency $1,838 $3,296 - - - $1,838 -
07 4.122: Develop standard procedures to improve internal yields $22,189 $16,860 - - - $22,189 -
TOTAL RECOMMENDED $47,993 $37,067 $2,651
22,654
kWh
$46
-
kW-mo/yr
$9,287
-
MMBtu
$34,171 $1,838
TOTAL IMPLEMENTED $23,484 $18,507 $331
3,033
kWh
$46
-
kW-mo/yr
$9,287
-
MMBtu
$11,982 $1,838
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs