ITAC Assessment: OR0695
ITAC logo
ITAC Assessment: OR0695
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Chilled water, steam, compressed air
NAICS 221330: Steam and Air-Conditioning Supply
SIC 4961: Steam and Air-Conditioning Supply
Sales Range less than $500
k
# of Employees 5
Plant Area 30,000
ft2
Annual Production 54,750
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,189,706 24,924,000
kWh
Electricity Demand $296,525 44,928
kW-mo/yr
Electricity Fees $6,336 -
Natural Gas $641,847 109,352
MMBtu
TOTAL YEARLY COSTS $2,134,414
RECOMMENDED SAVINGS* $39,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,279

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,343 $10,981 $8,745
182,181
kWh
$1,152
-
kW-mo/yr
- $1,833 $1,613
02 2.2624: Use cold waste water to cool chiller feed water $13,796 $30,600 $13,796
287,295
kWh
- - - -
03 2.2414: Use waste heat from hot flue gases to preheat $12,279 $43,386 - - $12,279
-
MMBtu
- -
TOTAL RECOMMENDED $39,418 $84,967 $22,541
469,476
kWh
$1,152
-
kW-mo/yr
$12,279
-
MMBtu
$1,833 $1,613
TOTAL IMPLEMENTED $12,279 $43,386 - - $12,279
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs