ITAC Assessment: OR0689
ITAC logo
ITAC Assessment: OR0689
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Custom metal fabrication
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 175,000
ft2
Annual Production 10
units
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,419 1,863,140
kWh
Electricity Demand $78,080 7,871
kW-mo/yr
Natural Gas $37,779 7,090
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $360,000 3,000
gal
TOTAL YEARLY COSTS $606,278
RECOMMENDED SAVINGS* $38,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 4.132: Purchase new equipment to reduce material use / cost $12,509 $19,000 $12,509
177,912
kWh
- - -
02 3.8113: Prevent excessive solvent usage (operator training) $18,000 $1,495 - - - $18,000
-
gal
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,595 $5,595 $4,435
63,080
kWh
$160
-
kW-mo/yr
- -
04 2.7314: Reduce ventilation air $3,492 $12,558 - - $3,492
-
MMBtu
-
TOTAL RECOMMENDED $38,596 $38,648 $16,944
240,992
kWh
$160
-
kW-mo/yr
$3,492
-
MMBtu
$18,000
-
gal
TOTAL IMPLEMENTED $35,104 $26,090 $16,944
240,992
kWh
$160
-
kW-mo/yr
- $18,000
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs