Assessment Year | 2017 |
---|---|
Principal Product | Custom metal fabrication |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
175,000
ft2
|
Annual Production | 10
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $130,419 | 1,863,140 |
kWh
|
$0.070 | |
Electricity Demand | $78,080 | 7,871 |
kW-mo/yr
|
$9.92 | |
Natural Gas | $37,779 | 7,090 |
MMBtu
|
$5.33 | |
Waste Disposal Costs | |||||
Other Liquid (non-haz) | $360,000 | 3,000 |
gal
|
$120.00 | |
TOTAL YEARLY COSTS | $606,278 | ||||
RECOMMENDED SAVINGS* | $38,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $35,104 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.132: Purchase new equipment to reduce material use / cost | $12,509 | $19,000 |
$12,509
177,912
kWh
|
- | - | - | |
02 | 3.8113: Prevent excessive solvent usage (operator training) | $18,000 | $1,495 | - | - | - |
$18,000
-
gal
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,595 | $5,595 |
$4,435
63,080
kWh
|
$160
-
kW-mo/yr
|
- | - | |
04 | 2.7314: Reduce ventilation air | $3,492 | $12,558 | - | - |
$3,492
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $38,596 | $38,648 |
$16,944
240,992
kWh
|
$160
-
kW-mo/yr
|
$3,492
-
MMBtu
|
$18,000
-
gal
|
||
TOTAL IMPLEMENTED | $35,104 | $26,090 |
$16,944
240,992
kWh
|
$160
-
kW-mo/yr
|
- |
$18,000
-
gal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs