Assessment Year | 2017 |
---|---|
Principal Product | Vinyl Components |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
140,000
ft2
|
Annual Production | 48,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $588,584 | 14,288,800 |
kWh
|
$0.041 | |
Electricity Demand | $296,475 | 39,530 |
kW-mo/yr
|
$7.50 | |
Electricity Fees | $89,263 | - |
|
- | |
Natural Gas | $42,199 | 4,758 |
MMBtu
|
$8.87 | |
Waste Disposal Costs | |||||
Water Disposal | $14,633 | 24,000 |
Tgal
|
$0.61 | |
TOTAL YEARLY COSTS | $1,031,154 | ||||
RECOMMENDED SAVINGS* | $226,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.625: Develop standard operating procedures | $181,947 | $31,400 | - | - |
$(-14,633.0)
-
Tgal
|
$28,080 | $(-7,000.0) | $175,500 | |
02 | 2.6218: Turn off equipment when not in use | $5,219 | - |
$5,219
115,318
kWh
|
- | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,997 | $1,200 |
$15,997
353,464
kWh
|
- | - | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,155 | - |
$1,596
35,259
kWh
|
$559
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,115 | $16,115 |
$12,193
269,576
kWh
|
$2,922
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,743 | $500 |
$5,619
124,149
kWh
|
$124
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $226,176 | $49,215 |
$40,624
897,766
kWh
|
$3,605
-
kW-mo/yr
|
$(-14,633.0)
-
Tgal
|
$28,080 | $(-7,000.0) | $175,500 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs