Assessment Year | 2016 |
---|---|
Principal Product | Pharmaceutical Drugs |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
22,000
ft2
|
Annual Production | 22,046
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,741 | 511,949 |
kWh
|
$0.078 |
Electricity Demand | $10,869 | 1,534 |
kW-mo/yr
|
$7.09 |
Electricity Fees | $33 | - |
|
- |
Natural Gas | $59,873 | 7,454 |
MMBtu
|
$8.03 |
TOTAL YEARLY COSTS | $110,516 | |||
RECOMMENDED SAVINGS* | $318,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,415 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.5123: Reduce fluid flow rates | $244,946 | $880,000 |
$73
889
kWh
|
$(-5,127.0)
-
kW-mo/yr
|
- | - | - | - | $250,000 | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $13,371 | $5,100 |
$3,777
53,410
kWh
|
- |
$9,594
-
MMBtu
|
- | - | - | - | |
03 | 2.7135: Install occupancy sensors | $14,066 | $10,367 |
$10,866
120,610
kWh
|
$865
-
kW-mo/yr
|
- | - | $906 | $1,429 | - | |
04 | 2.6218: Turn off equipment when not in use | $8,978 | $1,314 |
$3,390
41,060
kWh
|
- |
$5,588
-
MMBtu
|
- | - | - | - | |
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $8,398 | $2,405 | - | - | - |
$8,398
-
MMBtu
|
- | - | - | |
06 | 2.9114: Use solar heat to make electricty | $29,141 | $269,109 |
$28,988
351,126
kWh
|
$153
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $318,900 | $1,168,295 |
$47,094
567,095
kWh
|
$(-4,109.0)
-
kW-mo/yr
|
$15,182
-
MMBtu
|
$8,398
-
MMBtu
|
$906 | $1,429 | $250,000 | ||
TOTAL IMPLEMENTED | $36,415 | $16,781 |
$18,033
215,080
kWh
|
$865
-
kW-mo/yr
|
$15,182
-
MMBtu
|
- | $906 | $1,429 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs