Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Dimensional Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 150,000
ft2
Annual Production 32,175,000
units
Production Hrs. Annual 7,020
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $899,745 18,070,000
kWh
Electricity Demand $377,429 44,333
kW-mo/yr
Electricity Fees $50,953 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.112: Replace old machine with new automatic multi-station tool $41,305 $102,204 $5,330
111,184
kWh
$2,615
-
kW-mo/yr
$32,000 - $1,360
02 4.652: Replace existing equipment with more suitable substitutes $15,820 $2,500 - - $(-500.0) - $16,320
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,567 - $3,684
76,855
kWh
$3,883
-
kW-mo/yr
- - -
04 2.5121: Redesign flow to minimize mass transfer length $2,998 $864 $2,256
34,936
kWh
- $742 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,683 $6,683 $5,475
114,212
kWh
$208
-
kW-mo/yr
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,080 $302 $1,080
22,538
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $15,058 $67,152 $12,184
254,157
kWh
$4,266
-
kW-mo/yr
$2,824 $(-4,216.0) -
TOTAL RECOMMENDED $89,511 $179,705 $30,009
613,882
kWh
$10,972
-
kW-mo/yr
$35,066 $(-4,216.0) $17,680
TOTAL IMPLEMENTED $5,683 $6,683 $5,475
114,212
kWh
$208
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs