Assessment Year | 2015 |
---|---|
Principal Product | Dimensional Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $100 M to 500M |
# of Employees | 130 |
Plant Area |
150,000
ft2
|
Annual Production | 32,175,000
units
|
Production Hrs. Annual | 7,020
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $899,745 | 18,070,000 |
kWh
|
$0.050 |
Electricity Demand | $377,429 | 44,333 |
kW-mo/yr
|
$8.51 |
Electricity Fees | $50,953 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,683 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.112: Replace old machine with new automatic multi-station tool | $41,305 | $102,204 |
$5,330
111,184
kWh
|
$2,615
-
kW-mo/yr
|
$32,000 | - | $1,360 | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $15,820 | $2,500 | - | - | $(-500.0) | - | $16,320 | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,567 | - |
$3,684
76,855
kWh
|
$3,883
-
kW-mo/yr
|
- | - | - | |
04 | 2.5121: Redesign flow to minimize mass transfer length | $2,998 | $864 |
$2,256
34,936
kWh
|
- | $742 | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,683 | $6,683 |
$5,475
114,212
kWh
|
$208
-
kW-mo/yr
|
- | - | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,080 | $302 |
$1,080
22,538
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,058 | $67,152 |
$12,184
254,157
kWh
|
$4,266
-
kW-mo/yr
|
$2,824 | $(-4,216.0) | - | |
TOTAL RECOMMENDED | $89,511 | $179,705 |
$30,009
613,882
kWh
|
$10,972
-
kW-mo/yr
|
$35,066 | $(-4,216.0) | $17,680 | ||
TOTAL IMPLEMENTED | $5,683 | $6,683 |
$5,475
114,212
kWh
|
$208
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs