ITAC Assessment: OR0651
ITAC logo
ITAC Assessment: OR0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product X-Ray Film
NAICS 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 3861: Photographic Equipment and Supplies
Sales Range $1
M
to 5
M
# of Employees 350
Plant Area 237,000
ft2
Annual Production 5,028
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,421,422 29,748,600
kWh
Electricity Demand $423,116 49,390
kW-mo/yr
Electricity Fees $71,308 -
Natural Gas $1,195,183 244,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $422,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $329,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $58,422 $9,638 - - $58,422
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $270,822 $210,050 $129,268
2,734,104
kWh
$36,529
-
kW-mo/yr
- $105,025
03 3.5311: Recover and reuse waste material $93,635 $132,280 - - $93,635
-
MMBtu
-
TOTAL RECOMMENDED $422,879 $351,968 $129,268
2,734,104
kWh
$36,529
-
kW-mo/yr
$152,057
-
MMBtu
$105,025
TOTAL IMPLEMENTED $329,244 $219,688 $129,268
2,734,104
kWh
$36,529
-
kW-mo/yr
$58,422
-
MMBtu
$105,025
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs