Assessment Year | 2015 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 10 |
Plant Area |
830,000
ft2
|
Annual Production | 71,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,929 | 4,227,000 |
kWh
|
$0.053 |
Electricity Demand | $105,172 | 11,352 |
kW-mo/yr
|
$9.26 |
Electricity Fees | $17,833 | - |
|
- |
Natural Gas | $10,192 | 701 |
MMBtu
|
$14.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $16,127 | $9,607 |
$13,478
244,390
kWh
|
$2,649
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,082 | $17,274 |
$25,082
454,800
kWh
|
- | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $2,772 | $50 | - | - |
$2,772
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,835 | $9,332 |
$7,375
133,726
kWh
|
- | - | $(-2,540.0) | |
TOTAL RECOMMENDED | $48,816 | $36,263 |
$45,935
832,916
kWh
|
$2,649
-
kW-mo/yr
|
$2,772
-
MMBtu
|
$(-2,540.0) | ||
TOTAL IMPLEMENTED | $18,899 | $9,657 |
$13,478
244,390
kWh
|
$2,649
-
kW-mo/yr
|
$2,772
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs