ITAC Assessment: OR0648
ITAC logo
ITAC Assessment: OR0648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 830,000
ft2
Annual Production 71,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,929 4,227,000
kWh
Electricity Demand $105,172 11,352
kW-mo/yr
Electricity Fees $17,833 -
Natural Gas $10,192 701
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4323: Use optimum size and capacity equipment $16,127 $9,607 $13,478
244,390
kWh
$2,649
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,082 $17,274 $25,082
454,800
kWh
- - -
03 2.8114: Change rate schedules or other changes in utility service $2,772 $50 - - $2,772
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,835 $9,332 $7,375
133,726
kWh
- - $(-2,540.0)
TOTAL RECOMMENDED $48,816 $36,263 $45,935
832,916
kWh
$2,649
-
kW-mo/yr
$2,772
-
MMBtu
$(-2,540.0)
TOTAL IMPLEMENTED $18,899 $9,657 $13,478
244,390
kWh
$2,649
-
kW-mo/yr
$2,772
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs